We've Moved!
Visit SDSU’s new digital collections website at https://digitalcollections.sdsu.edu
Paving concourse, Aztec Center construction site, 1968
Digital Item
Lisa System Manager
This item is active and ready to use
AZTECCENTER-372
Paving concourse, Aztec Center construction site, 1968
02/29/1968
Enter a free text date.
Shulman, Julius
Architect: Mosher, Robert
The middle building of the three, variously referred to as "concourse," "promenade," "corridor," etc. is mostly finished as to the colonnades and ceiling vaults but the ground is bare. Here a construction worker labors in the middle near one end.
San Diego State College; Aztec Center; Construction sites
5500 Campanile Drive
California - San Diego - San Diego State University
© San Diego State University. All rights reserved.
- Aztec Center Construction Scrapbook
Photographic print; black and white
3.5 inches X 4.25 inches
No
- San Diego State University Library and Information Access
Associated Students
Image
TIFF
9.55 MB
Bookmark this page https://digital.sdsu.edu/view-item?i=300180
Browse the items