We use cookies to improve your experience, some are essential for the operation of this site.
  • Multi-Media Collection

Aztec Center Construction, Part 3

Digital Item
Lisa System Manager
This item is active and ready to use
AZTECCENTERCONSTRUCTION3
Aztec Center Construction, Part 3
circa 1967
Enter a free text date.
This hour long video shows interior finishing of the construction of the old Aztec Center at San Diego State University, including polishing and cleanup. It also includes scenes of setting up spaces in the new building, and opening events that took place at the Center. Unidentified dignitaries attend opening ceremonies. It includes other footage around campus as well. There is no sound. Like the other construction videos of Aztec Center, it goes for just over a minute before skipping ahead to about to minute 13 and must be nudged to continue.
St. Dunstan's Episcopal Church; Furniture moving; Offices; Electric typewriters; File cabinets; Lighting; Barber shops; Cash registers; Haircuts; Gymnasia; Gymnasiums; Fitness equipment; M-V Sporting Goods; Bowling alleys; Bowling; Billiards; Opening ceremonies; Building openings; Bands; Photographers; Motion-picture cameras; Courtyards; Punch bowls; Crowds; Speakers; Ribbon cutting ceremonies; Karate demonstrations; Bulletin boards; Lounges; Students; Campus dining; Student unions; Aztec Center; Free Speech Steps; Briefcases; Exhibits; Sycamore trees; Group portraits; Main Quad
6075 Physical Plant Way
California - San Diego - San Diego State University
© San Diego State University. All rights reserved.
  • Multi-Media Collection
01:01:52
Yes
AZTECCENTERCONSTRUCTION1; AZTECCENTERCONSTRUCTION2
  • San Diego State University Library and Information Access, Special Collections and University Archives
Video
MOV
8.07 GB
of 154
Browse the items