We use cookies to improve your experience, some are essential for the operation of this site.
  • Multi-Media Collection

Aztec Center Construction, Part 2

Digital Item
Lisa System Manager
This item is active and ready to use
AZTECCENTERCONSTRUCTION2
Aztec Center Construction, Part 2
circa 1967
Enter a free text date.
This hour long video shows various phases of the construction of the old Aztec Center at San Diego State University. There is no sound. Views from the top floors are shown. Inspecting groups are shown through the construction site. At various points the buildings around the Center are pictured. The Aztec Center was opened in 1968. After a little over a minute the medium skips to about 13 minutes and loses visual. The marker on the video has to be moved sligh
Foundations; Beams; Cranes (machines); Scaffolding; Construction workers; Construction sites; Construction equipment; Pillars; Columns; Roofs; Vents; Catwalks; Windows; Ladders; Lighting; Scaffold platforms; Berms; Inspections; Tours; Ducts; Students; Wheelbarrows; Power buggies; San Diego State College; Roofing tar; Plastic sheeting; Skylights; Vaults; Construction materials; Construction site trailers; Construction crews; Vintage cars; Architects; Building contractors; Meetings; Balconies; Hard hats; Courtyards; Sycamore trees; Girders; Concrete finishing; Shotcrete; Welding; Trenches; Construction fences; Surveyor's instruments; Lunch breaks
6075 Physical Plant Way
California - San Diego - San Diego State University
© San Diego State University. All rights reserved.
  • Multi-Media Collection
01:01:05
Yes
AZTECCENTERCONSTRUCTION1; AZTECCENTERCONSTRUCTION3
  • San Diego State University Library and Information Access, Special Collections and University Archives
Video
MOV
8.82 GB
of 154
Browse the items